Public Utility
Springfield Lebanon Water Interconnect
16,000 Linear Feet of Water Main Infrastructure Installation
Project Details
Water Main Installation by Earth Works
The Springfield Lebanon Water Interconnect project involved installing 16,000 linear feet of 8-inch water main infrastructure alongside a master meter vault and multiple directional and grade bores. Bell Engineering managed the Design-Bid-Build delivery approach.
Federal funding required compliance with Davis-Bacon Act provisions and American Iron and Steel regulations, ensuring adherence to labor and materials standards throughout the project.
Overcoming Obstacles
Project Challenges
Solid Rock Excavation
Solid rock excavation requirements demanded advanced excavation techniques and specialized equipment to maintain progress through challenging geological conditions.
Existing Utilities
Numerous existing utilities required careful coordination. Earth Works maintained close coordination with utility companies to navigate complex underground infrastructure while ensuring safety standards.
Aggressive Schedule
An aggressive project schedule demanded consistent high production rates. The team employed innovative solutions to maintain progress while addressing complex site conditions.
Federal Compliance
Federal funding required strict compliance with Davis-Bacon Act provisions and American Iron and Steel regulations, adding an additional layer of regulatory oversight to the project.
Gallery
Project Photos
Start Your Project
Do You Have A Construction Project We Can Help With?
From public utilities to heavy industrial, Earth Works LLC delivers exceptional results on every job.